Jump to content

New windows for the castle!

Scaffolding in front of a window of the castle
Electoral Palace

Scaffolding and protective tarpaulins leave no doubt: the renovation of the castle is underway. Craftsmen are currently working on the inner north wing. The carpenter recently installed the sample window there. It was designed based on findings by architectural historians and approved by the historic preservation authorities. The design is by Kurz Architekten GbR. The building committee and historic preservation authorities are now deciding on minor details, such as the color of the frames. Then the window manufacturer can install the window in all seven axes of the north wing.

Explanations and notes

Picture credits

Sprachauswahl

Quick search

This website was automatically translated using AI

This website was automatically translated by DeepL's AI. It is possible that the machine translations may not fully correspond to the original text. The State Capital of Mainz assumes no liability for the accuracy, completeness, or timeliness of the translations. Furthermore, there is no guarantee that all content on mainz.de will be fully translated —for example, applications integrated as i-frames (such as “Lost and Found Online”), content embedded via interfaces (such as the events calendar), and files (e.g., PDFs, images, graphics) may not be translated. No liability is assumed for damages resulting from missing, incomplete, or incorrect translations.

When accessing the pages, personal data remains anonymous, as no data is transmitted to the service provider. The translated content is stored locally on the web server of the State Capital of Mainz and made available directly from there.