Jump to content
29. April 2026

Full closure of Backhaushohl due to road surface renovation

As part of a construction project by Mainzer Netze, a section of the road surface in Backhaushohl street is now also being renovated. Preparatory work is currently being carried out in the streets Backhaushohl 12-28, Draiser Straße (from house number 170 to the junction with Backhaushohl) and in the cul-de-sac Backhaushohl 14-16.

Starting Monday, May 11, 2026, access to and from the houses cannot be guaranteed at all times between 7:00 a.m. and 5:00 p.m. From May 26 to May 28, 2026, this area will be completely closed due to paving work. 

The current traffic routing remains unchanged.

Explanations and notes

Sprachauswahl

Quick search

This website was automatically translated using AI

This website was automatically translated by DeepL's AI. It is possible that the machine translations may not fully correspond to the original text. The State Capital of Mainz assumes no liability for the accuracy, completeness, or timeliness of the translations. Furthermore, there is no guarantee that all content on mainz.de will be fully translated —for example, applications integrated as i-frames (such as “Lost and Found Online”), content embedded via interfaces (such as the events calendar), and files (e.g., PDFs, images, graphics) may not be translated. No liability is assumed for damages resulting from missing, incomplete, or incorrect translations.

When accessing the pages, personal data remains anonymous, as no data is transmitted to the service provider. The translated content is stored locally on the web server of the State Capital of Mainz and made available directly from there.