Jump to content
13. May 2026

Lane closure on the Alicen Bridge

From Monday, May 18 until probably June 26, 2026, another lane will be closed on the Alicenbrücke in addition to the already closed right-hand lane leading out of town, as well as the footpath and cycle path.

This is necessary because work on the bridge’s transition structures is continuing. Motorized private vehicles will be routed past the construction site in two lanes via the re-marked traffic area. 

Pedestrian and bicycle traffic will be routed across the second closed lane via a temporary sidewalk.

Explanations and notes

Sprachauswahl

Quick search

This website was automatically translated using AI

This website was automatically translated by DeepL's AI. It is possible that the machine translations may not fully correspond to the original text. The State Capital of Mainz assumes no liability for the accuracy, completeness, or timeliness of the translations. Furthermore, there is no guarantee that all content on mainz.de will be fully translated —for example, applications integrated as i-frames (such as “Lost and Found Online”), content embedded via interfaces (such as the events calendar), and files (e.g., PDFs, images, graphics) may not be translated. No liability is assumed for damages resulting from missing, incomplete, or incorrect translations.

When accessing the pages, personal data remains anonymous, as no data is transmitted to the service provider. The translated content is stored locally on the web server of the State Capital of Mainz and made available directly from there.