Jump to content
20. October 2026

Alternating lane closures on the Alicen Bridge

On Thursday and Friday, October 22 and 23, 2026, the Mainz Public Works Department will be conducting work on the pedestrian crossings on the Alicen Bridge. From 9:00 a.m. to 3:00 p.m. each day, the left lane in the direction of downtown and Saarstraße will therefore be closed alternately.
Motorized private vehicles will be routed past the closure in a single lane. This measure will not affect pedestrians or cyclists.

Explanations and notes

Sprachauswahl

Quick search

This website was automatically translated using AI

This website was automatically translated by DeepL's AI. It is possible that the machine translations may not fully correspond to the original text. The State Capital of Mainz assumes no liability for the accuracy, completeness, or timeliness of the translations. Furthermore, there is no guarantee that all content on mainz.de will be fully translated —for example, applications integrated as i-frames (such as “Lost and Found Online”), content embedded via interfaces (such as the events calendar), and files (e.g., PDFs, images, graphics) may not be translated. No liability is assumed for damages resulting from missing, incomplete, or incorrect translations.

When accessing the pages, personal data remains anonymous, as no data is transmitted to the service provider. The translated content is stored locally on the web server of the State Capital of Mainz and made available directly from there.