Am Lemmchen school site: New high school, replacement elementary school, Realschule Plus, canteen and sports halls - A construction project of the state capital Mainz, Department VI - Building, Monument Preservation and Culture, Building Management Mainz
Welcome to the blog about the Am Lemmchen school site in Mainz-Mombach: a place of change and dialog!
Construction work has begun on a new high school in Mainz-Mombach. The four-stream high school is designed as a "school with a special inclusive profile" and will be a shared learning environment for students with and without disabilities. The high school will be located in Mainz-Mombach "Am Lemmchen" alongside the schools already located there (elementary school and secondary school). These, along with a cafeteria and two sports halls, will be rebuilt after the high school is completed, creating a modern school location for all age groups.
This long-term construction project has an impact on the people in the surrounding area. On the one hand, a modern learning environment for children of all ages from the surrounding area is being created, but on the other hand, the construction work is affecting the everyday lives of local residents. For this reason, this construction site blog has been set up. Here you will find continuous, reliable information about the Am Lemmchen school construction project. Join us as we create this modern school location.
Stay informed
Welcome to the new construction site blog. Here you will find everything you need to know about the upcoming new building, as well as current construction progress and further background information about the project itself.
New Mombach secondary school building - objection proceedings lead to delay in start of construction (June 2025)
New Mombach secondary school: felling of ten trees to prepare the construction site (February 2025)
Future-oriented construction with green roof and photovoltaic system (February 2025)
New developments at the "Am Lemmchen" school site: Interim canteen and interim school in operation (August 2024)
Events and highlights
A school center is not just a building, but a lively place of education and encounter. We will keep you informed about upcoming events on this blog, whether it's the laying of the foundation stone, dates for public information sessions, or other special occasions. Learn more about the people involved in this project and be inspired by the stories that this school center will write.
Site inspection on March 20, 2024
A modern school center takes shape
What are the plans for the Am Lemmchen school site in Mainz-Mombach?
Last year, the state capital of Mainz launched a complex construction project. The new school center in Mainz-Mombach "Am Lemmchen" is to be built. The new buildings will include a new high school as well as the existing elementary and secondary schools on the site. The students of the high school, which is currently located on Lerchenberg, are scheduled to move into the temporary building on the site of the new school center in July 2024. The new address of the high school at the Am Lemmchen school location will then be Karlsstraße 23. The project also plans to replace the current two-court sports hall with two three-court sports halls. The aim is to create a modern and inclusive school center that enables joint learning across all age groups.
Where will the students be taught in the meantime?
During the individual construction phases, the students of the school under construction will be taught temporarily in an interim building constructed using modular construction methods. This will enable the project to be implemented seamlessly while the school continues to operate.
What are the different construction phases?
Construction work on the school site began with the erection of the modular interim building, which is scheduled to be occupied in 2024. At the end of 2024, construction work on the new high school, which will be built using a hybrid wood construction method, is scheduled to begin in the northern part of the property. This will be followed by the new building for the elementary school and the secondary school, which will be housed in a single building complex in the future. The construction of a new central cafeteria and two three-court sports halls arranged one above the other is also planned. The demolition of the existing sports hall will then create space for high-quality outdoor facilities and playgrounds designed to meet the needs of the students, offering areas for exercise and recreation.
The project in figures
- 31,000 square meters of total land
- Approximately 9,010 square meters of floor space for the new buildings
- Approximately 8,300 square meters of required playground space
- Approximately 3,000 square meters of temporary buildings, 302 modules, three stories
- Approximately 1,000 screw foundations
- Start of construction for the high school section: Fall 2024